The Resource Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation

Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation

Label
Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation
Title
Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation
Title variation
Extension of time for railway on Omaha and Winnebago reservation, Nebraska
Creator
Author
Subject
Genre
Language
eng
Member of
Cataloging source
UMI
http://bibfra.me/vocab/lite/collectionName
ProQuest U.S. Serial Set Digital Collection
Government publication
federal national government publication
Index
no index present
LC call number
KF12
LC item number
.U5 59th Congress, 2nd session no.5065 H.rp.8153 ONLINE
Literary form
non fiction
http://bibfra.me/vocab/lite/organizationName
United States
Series statement
Report / House of Representatives
Series volume
No. 8153
http://library.link/vocab/subjectName
  • Railroads
  • Omaha Indian Reservation (Neb.)
  • Winnebago Reservation (Neb.)
Label
Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation
Instantiates
Publication
Note
Record is based on bibliographic data in ProQuest U.S. Serial Set Digital Collection (last viewed Mar. 2007). Reuse except for individual research requires license from ProQuest, LLC
Antecedent source
mixed
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
cis2004122101
Dimensions
unknown
Extent
1 online resource (1 page)
File format
one file format
Form of item
online
Level of compression
mixed
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
digital, PDF file
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic resource.
Specific material designation
remote
Label
Granting extension of time for construction of a railway on the Omaha and Winnebago Reservation
Publication
Note
Record is based on bibliographic data in ProQuest U.S. Serial Set Digital Collection (last viewed Mar. 2007). Reuse except for individual research requires license from ProQuest, LLC
Antecedent source
mixed
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Control code
cis2004122101
Dimensions
unknown
Extent
1 online resource (1 page)
File format
one file format
Form of item
online
Level of compression
mixed
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
digital, PDF file
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic resource.
Specific material designation
remote

Library Locations

    • Pardee Legal Research CenterBorrow it
      5998 Alcalá Park, San Diego, CA, 92110-2492, US
      32.771471 -117.187496
Processing Feedback ...