The Resource Release of lien and extension of time on Austrian loan

Release of lien and extension of time on Austrian loan

Label
Release of lien and extension of time on Austrian loan
Title
Release of lien and extension of time on Austrian loan
Title variation
Release of lien and extension of time on Austrian loan
Creator
Author
Issued With
I98SZsIPMFA
Subject
Genre
Language
eng
Member of
Cataloging source
UMI
http://bibfra.me/vocab/lite/collectionName
ProQuest U.S. Serial Set Digital Collection
Government publication
federal national government publication
Illustrations
charts
Index
no index present
LC call number
KF12
LC item number
.U5 67th Congress, 2nd session no.7956 H.rp.830 ONLINE
Literary form
non fiction
http://bibfra.me/vocab/lite/organizationName
United States
Series statement
H.rp.830
http://library.link/vocab/subjectName
  • Debts, External
  • Loans
  • Austria
Label
Release of lien and extension of time on Austrian loan
Instantiates
Publication
Note
Record is based on bibliographic data in ProQuest U.S. Serial Set Digital Collection (last viewed Sept. 2007). Reuse except for individual research requires license from ProQuest, LLC
Antecedent source
mixed
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
cis2004158288
Dimensions
unknown
Extent
1 online resource (3 pages)
File format
one file format
Form of item
online
Level of compression
mixed
Media category
computer
Media MARC source
rdamedia
Media type code
c
Other physical details
digital, PDF file
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic resource.
Specific material designation
remote
Label
Release of lien and extension of time on Austrian loan
Publication
Note
Record is based on bibliographic data in ProQuest U.S. Serial Set Digital Collection (last viewed Sept. 2007). Reuse except for individual research requires license from ProQuest, LLC
Antecedent source
mixed
Carrier category
online resource
Carrier category code
cr
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Control code
cis2004158288
Dimensions
unknown
Extent
1 online resource (3 pages)
File format
one file format
Form of item
online
Level of compression
mixed
Media category
computer
Media MARC source
rdamedia
Media type code
c
Other physical details
digital, PDF file
Quality assurance targets
present
Reformatting quality
preservation
Reproduction note
Electronic resource.
Specific material designation
remote

Library Locations

    • Pardee Legal Research CenterBorrow it
      5998 Alcalá Park, San Diego, CA, 92110-2492, US
      32.771471 -117.187496
Processing Feedback ...